Free Kinetic Chain Assessment in Ammon, ID

Sports Performance in Ammon, ID

Your First Visit Is a Test, Not a Tour

Get Started
Get Started

The Kinetic Chain Assessment

Most gyms start your first visit with a walkthrough. We start with a measurement.

Your first visit to FitRight is a Kinetic Chain Assessment — about an hour, one athlete, one coach, and a full pass through our testing stack. You leave knowing where force is produced, where it is lost, and what to do about it. No pressure and no pitch.

What We Assess

Athletic movement is a chain. Force starts at the ground and travels through the ankle, knee, hip and trunk before it comes out as a sprint, a jump, or a throw. Every link either passes force along or leaks it. The assessment finds the leaks.

Movement screen. Before anything is loaded or timed, a coach watches how you move — squat and single-leg mechanics, how you land, and how one side compares to the other. This is what gives the numbers their context.

Then we measure five categories:

  • Force Production — maximum strength. Keiser pneumatic leg press (right and left), pro squat, chop bar, bench.
  • Force Expression — how much of that strength becomes movement. Vertical, countermovement jump, squat jump and broad jump, measured on a jump mat in height and in watts.
  • Ground Contact — reactive, elastic ability. Reactive Strength Index and single-leg triple hop: force produced in fractions of a second on the ground.
  • Speed & Acceleration — Freelap wireless timing gates. 10-yard, 40-yard, flying 10, and field top speed in miles per hour.
  • Body Strength — strength per pound of bodyweight. Pull-ups and push-ups.

What You Leave With

Within 48 hours you get your FitRight Performance Card — a five-page report, not a sales sheet.

A FitRight Performance Card showing an athlete’s FitRight Score, category breakdown and standout marks
  • A FitRight Score out of 100, with every result ranked by percentile against real Idaho athletes of the same age and sex — our actual roster, not a textbook table.
  • Your five category scores, so the strongest link and the weakest link are both obvious.
  • Your Elastic Utilization Ratio — whether you have strength you are not using, or spring sitting on a thin strength floor.
  • A left-to-right comparison on every paired test, with any gap over 10% flagged.
  • A coach’s note naming one standout, one growth area, and what the next training block will do about it.

Then We Retest

Same tests, four to eight weeks later. The Gains page shows the change on paper, and personal records post to the leaderboard. That is the whole model: test, train, retest.

The Gains page of a FitRight Performance Card, showing percent improvement per metric between two test dates
FitRight progress report: the largest improvement on record for every test we run, across 221 athletes.

How It Works

  • Book your assessment below, or call (208) 206-8519.
  • Come in training clothes, a few minutes early.
  • Ten-minute test prep warm-up, then the stations with a coach.
  • Your card lands in your inbox within two days.

Who It Is For

Athletes 9 and up, every sport, every starting point — and adults too. You do not need to be in shape, and you do not need to have trained before. A baseline is just a number to beat.

‍

‍

‍

‍

‍

TRUSTED AND LOVED BY HUNDREDS OF ATHLETES IN AMMON, ID AND BEYOND

Program Gallery Image
Program Gallery Image
Program Gallery Image
Program Gallery Image
Program Gallery Image
Program Gallery Image
Program Gallery Image
(Select Location)

Conveniently located right off of 17th street in Ammon.

3160 E 17th St #120, Ammon, ID, 83406

Working out at the gym isn't easy. But getting there shouldn't be hard. FitRight Athletics is located and easily accessible from all of Ammon, ID.

Get Fit the Right Way, the FitRight Way! Become the best version of yourself... This is the FitRight Athletics Way